Malaysia Q2 Construction Output Growth Accelerates

2026-08-13 04:10 By Farida Husna 1 min. read

Malaysia’s construction activity grew 8.8% year-on-year in Q2 2026, quickening from an 8.5% increase in the previous quarter, which marked the sector’s slowest growth since Q4 2023.

The solid result was mainly driven by faster civil engineering activity (2.7% vs 1.5% in Q1), which remained the largest contributor to the sector, accounting for 35.0% of total output.

Growth in non-residential buildings also strengthened (13.3% vs 12.7%), representing 29.3% of overall activity.

Meanwhile, residential building activity accelerated further (8.7% vs 6.1%), contributing 22.8% of total output.

In contrast, special trade activities moderated sharply (17.6% vs 24.6%), although they still accounted for 12.9% of total construction activity.



News Stream
Malaysia Q2 Construction Output Growth Accelerates
Malaysia’s construction activity grew 8.8% year-on-year in Q2 2026, quickening from an 8.5% increase in the previous quarter, which marked the sector’s slowest growth since Q4 2023. The solid result was mainly driven by faster civil engineering activity (2.7% vs 1.5% in Q1), which remained the largest contributor to the sector, accounting for 35.0% of total output. Growth in non-residential buildings also strengthened (13.3% vs 12.7%), representing 29.3% of overall activity. Meanwhile, residential building activity accelerated further (8.7% vs 6.1%), contributing 22.8% of total output. In contrast, special trade activities moderated sharply (17.6% vs 24.6%), although they still accounted for 12.9% of total construction activity.
2026-08-13
Malaysia Q1 Construction Output Rises the Least in Over 2 Years
Malaysia’s construction activity rose 8.5% year-on-year in Q1 2026, easing from a 10.3% increase in the previous quarter and marking the slowest growth since Q4 2023. The moderation was mainly due to softer civil engineering activity, which expanded 1.5% after a 3.6% rise in Q4, while remaining the largest contributor to the sector with a 34.2% share. Growth in non-residential buildings also slowed sharply (12.7% vs 18.6%), accounting for 29.9% of total output. Meanwhile, residential building activity accelerated (6.1% vs 5.9%), representing 22.5% of the total. Special trade activities continued to post strong growth (24.6% vs 21.1%), with a 13.3% share of overall activity. 2025, In 2025, construction output increased 12.5%, slowing from a sharp 20.2% increase in the prior year.
2026-05-13
Malaysia Q4 Construction Output Rises the Least in 2 Years
Malaysia’s construction activity increased 10.3% year-on-year in Q4 2025, following a 10.6% growth in the previous period. It marked the slowest pace since Q4 2023, as growth slowed for residential buildings (5.9% vs 11.6% in Q3), accounting for 22.6% of the total; and civil engineering projects (3.6% vs 8.9%), contributing the largest share at 34.9%. Meanwhile, non-residential buildings accelerated (18.6% vs 10.0%), with a 30.1% share; alongside special trade activities (21.1% vs 15.3%), making up 12.4% of the total. For the whole year, construction output expanded 12.5%, slowing from a 20.2% jump in 2024.
2026-02-11