TRADING
ECONOMICS
CALENDAR
INDICATORS
Countries
Indicators
MARKETS
Currencies
Stocks
Commodities
Bonds
Earnings
FORECASTS
Countries
Indicators
Currencies
Stocks
Commodities
Bonds
APPS
DATA
Download historical data for 20 million indicators using your browser.
Already a user? Login
API GATEWAY
Direct access to our calendar releases and historical data from your apps.
ALERTS
Receive releases for indicators in your mail inbox and set alerts for markets.
ESTIMATES
Join the world's largest survey of market forecasts and estimates for indicators.
IECONOMICS
Intelligent search to get instant answers with data and charts.
UECONOMICS
Drag & drop charts and store your calendar preferences in a dashboard.
Afghanistan - Percentage of female graduates from tertiary education graduating from Engineering, Manufacturing and Construction programmes, female
Percentage of female graduates from tertiary education graduating from Engineering, Manufacturing and Construction programmes, female (%) in Afghanistan was reported at 1.8423 % in 2014, according to the World Bank collection of development indicators, compiled from officially recognized sources.
Historical
Data
API
1Y
5Y
10Y
MAX
Column
Line
Area
Spline
Splinearea
Candlestick
Bars
Trend
Average(4)
Histogram
Variance
Mean
Maximum
Minimum
Export Data
API Access
OK
<iframe src='https://tradingeconomics.com/embed/?s=afg.se.ter.grad.en.fe.zs%3aworldbank&lbl=0&v=201804300000v&h=300&w=600&ref=/afghanistan/percentage-of-female-graduates-from-tertiary-education-graduating-from-engineering-manufacturing-and-construction-programmes-female-percent-wb-data.html' height='300' width='600' frameborder='0' scrolling='no'></iframe><br />source: <a href='https://tradingeconomics.com/afghanistan/percentage-of-female-graduates-from-tertiary-education-graduating-from-engineering-manufacturing-and-construction-programmes-female-percent-wb-data.html'>tradingeconomics.com</a>
width
height
Preview
Trading Economics members can view, download and compare data from nearly 200 countries, including more than 20 million economic indicators, exchange rates, government bond yields, stock indexes and commodity prices.
Learn More
Register
Login
The Trading Economics Application Programming Interface (API) provides direct access to our data. It allows API clients to download millions of rows of historical data, to query our real-time economic calendar, subscribe to updates and receive quotes for currencies, commodities, stocks and bonds.
Learn More
Interested?
Click here to contact us
Share of all female tertiary graduates who completed engineering, manufacturing and construction programmes in the reference year.
Afghanistan | Education
Literacy rate, youth total (% of people ages 15-24) UNESCO
39
%
School enrolment, preprimary, national source (% gross)
95
%
Gross intake ratio in grade 1, total, national source
92.7
%
Gender parity index for gross intake ratio in grade 1
0.86
Rate of out of school children, national source
17
%
Primary completion rate, total, national source
83
%
Gender parity index for primary completion rate
0.75
Progression to secondary school, national source
87
%
Lower secondary completion rate, total, national source
87.6
%
Lower secondary education, new teachers, national source
2038
Primary education, new entrants, national source
1364700
Lower secondary education, classrooms, national source
49041
Lower secondary education, new classrooms, national source
9404
Ratio of textbooks per pupil, primary education, mathematics
1
Ratio of textbooks per pupil, primary education, language
1
Primary education, pupils, national source
7020710
Primary education, teachers, national source
133615
Primary education, new teachers, national source
4983
Primary education, classrooms, national source
96900
Primary education, new classrooms, national source
17059
Lower Secondary education, new entrants, national source
752312
Lower secondary education, pupils, national source
2098183
Lower secondary education, teachers, national source
53138
Public spending on total education
16
%
Public spending on basic education
69
%
Public recurrent spending on total education
16.6
%
Public recurrent spending on basic education (% of public recurrent spending on total education)
14.63
%
International aid disbursed to total education, CIDA to Afghanistan
37
USD Million
International aid disbursed to total education, Sida to Afghanistan
10.33
USD Million
International aid disbursed to total education, UNESCO to Afghanistan
0.07
USD Million
International aid disbursed to total education, World Bank to Afghanistan
40
USD Million
International aid disbursed to total education, DANIDA to Afghanistan
20
USD Million
International aid disbursed to total education, France to Afghanistan
2.16
USD Million
International aid disbursed to total education, Germany to Afghanistan
64.51
USD Million
International aid disbursed to total education, Japan's MoFA to Afghanistan
32.5
USD Million
International aid disbursed to total education, JICA to Afghanistan
0.95
USD Million
International aid disbursed to total education, Netherlands to Afghanistan
7
USD Million
International aid disbursed to total education, New Zealand to Afghanistan
0.75
USD Million
International aid for total education, disbursed (up to present year) and scheduled (next years), aggregation of reporting donors
56.1
USD Million
International aid disbursed to basic education, CIDA to Afghanistan
29
USD Million
International aid disbursed to basic education, Sida to Afghanistan
23.55
USD Million
International aid disbursed to basic education, UNESCO to Afghanistan
0.03
USD Million
International aid disbursed to basic education, World Bank to Afghanistan
40
USD Million
International aid disbursed to basic education, DANIDA to Afghanistan
20
USD Million
International aid disbursed to basic education, France to Afghanistan
1.33
USD Million
International aid disbursed to basic education, Germany to Afghanistan
33.57
USD Million
International aid disbursed to basic education, Japan's MoFA to Afghanistan
25
USD Million
International aid disbursed to basic education, JICA to Afghanistan
0.95
USD Million
International aid disbursed to basic education, Netherlands to Afghanistan
2
USD Million
International aid disbursed to basic education, New Zealand to Afghanistan
0.39
USD Million
International aid for basic education, disbursed (up to present year) and scheduled (next years), aggregation of reporting donors
29.98
USD Million
Coordinating agency of Local Education Group (1=text in notes)
1
Donor members in Local Education Group (1=text in notes)
1
Civil society organizations in Local Education Group (1=text in notes)
1
Date of next Joint Education Sector Review (year=full date in notes)
-0.999
Starting year of current Education Sector Plan period (year=full period in notes)
2011
Ending year of current Education Sector Plan period (year=full period in notes)
2013
Current allocation - Supervising or managing entity (1=text in notes)
1
Current allocation - Modality (1=text in notes)
1
Current allocation - Annual disbursements
24.21
USD Million
Endorsement of Education Sector Plan
2011
Current allocation - Approval
2011
Current allocation - Total indicative amount
55.7
USD Million
Current allocation - Starting year of implementation period (year=full period in notes)
2012
Current allocation - Ending year of Implementation period (year=full period in notes)
2015
Current allocation - Signature date (year=full date in notes)
-0.999
Current allocation - Closing date (year=full date in notes)
-0.999
Administration of school leaving exams (yes=1, no=0, see notes if available)
1
Participation in international tests (yes=1, no=0, see notes if available)
0
Realization of national assessments (yes=1, no=0, see notes if available)
0
Administration of oral reading fluency tests (yes=1, no=0, see notes if available)
1
Alignment of aid to education (% of total international aid to education)
0
%
Coordinated technical cooperation (% of total cooperation to education)
76
%
Use of public financial management country systems (% of total international aid to education)
28
%
Use of procurement country systems (% of total international aid to education)
56
%
Number of parallel implementation units, education sector
4
Aid provided through program based approaches (% of international aid to education)
39
%
Percentage of female population age 15-19 with no education
59.18
%
Percentage of population age 15-19 with no education
37.2
%
Percentage of female population age 15+ with no education
78.24
%
Percentage of population age 15+ with no education
58.38
%
Percentage of female population age 20-24 with no education
77.56
%
Percentage of population age 20-24 with no education
54.52
%
Percentage of female population age 25-29 with no education
69.62
%
Percentage of population age 25-29 with no education
48.32
%
Percentage of female population age 25+ with no education
84.35
%
Percentage of population age 25+ with no education
66.02
%
Percentage of female population age 30-34 with no education
83.03
%
Percentage of population age 30-34 with no education
68.31
%
Percentage of female population age 35-39 with no education
84.89
%
Percentage of population age 35-39 with no education
67.17
%
Percentage of female population age 40-44 with no education
85.39
%
Percentage of population age 40-44 with no education
59.77
%
Percentage of female population age 45-49 with no education
88.19
%
Percentage of population age 45-49 with no education
67.39
%
Percentage of female population age 50-54 with no education
89.5
%
Percentage of population age 50-54 with no education
71.43
%
Percentage of female population age 55-59 with no education
94.8
%
Percentage of population age 55-59 with no education
78.4
%
Percentage of female population age 60-64 with no education
94.8
%
Percentage of population age 60-64 with no education
78.4
%
Percentage of female population age 65-69 with no education
98.6
%
Percentage of population age 65-69 with no education
91.09
%
Percentage of female population age 70-74 with no education
98.55
%
Percentage of population age 70-74 with no education
90.84
%
Percentage of female population age 75+ with no education
99.4
%
Percentage of population age 75+ with no education
94.04
%
Percentage of female population age 15-19 with primary schooling. Completed Primary
0.02
%
Percentage of population age 15-19 with primary schooling. Completed Primary
25.5
%
Percentage of female population age 15+ with primary schooling. Completed Primary
0.61
%
Percentage of population age 15+ with primary schooling. Completed Primary
12.86
%
Percentage of female population age 20-24 with primary schooling. Completed Primary
1.99
%
Percentage of population age 20-24 with primary schooling. Completed Primary
9.54
%
Percentage of female population age 25-29 with primary schooling. Completed Primary
14.23
%
Percentage of population age 25-29 with primary schooling. Completed Primary
16.68
%
Percentage of female population age 25+ with primary schooling. Completed Primary
0.8
%
Percentage of population age 25+ with primary schooling. Completed Primary
8.1
%
Percentage of female population age 30-34 with primary schooling. Completed Primary
2.03
%
Percentage of population age 30-34 with primary schooling. Completed Primary
3.63
%
Percentage of female population age 35-39 with primary schooling. Completed Primary
0.59
%
Percentage of population age 35-39 with primary schooling. Completed Primary
10.03
%
Percentage of female population age 40-44 with primary schooling. Completed Primary
0.57
%
Percentage of population age 40-44 with primary schooling. Completed Primary
7.71
%
Percentage of female population age 45-49 with primary schooling. Completed Primary
0.54
%
Percentage of population age 45-49 with primary schooling. Completed Primary
3.08
%
Percentage of female population age 50-54 with primary schooling. Completed Primary
0.6
%
Percentage of population age 50-54 with primary schooling. Completed Primary
1.6
%
Percentage of female population age 55-59 with primary schooling. Completed Primary
0.3
%
Percentage of population age 55-59 with primary schooling. Completed Primary
0.7
%
Percentage of female population age 60-64 with primary schooling. Completed Primary
0.3
%
Percentage of population age 60-64 with primary schooling. Completed Primary
0.7
%
Percentage of female population age 65-69 with primary schooling. Completed Primary
0.06
%
Percentage of population age 65-69 with primary schooling. Completed Primary
0.33
%
Percentage of female population age 70-74 with primary schooling. Completed Primary
0.06
%
Percentage of population age 70-74 with primary schooling. Completed Primary
0.33
%
Percentage of female population age 75+ with primary schooling. Completed Primary
0
%
Percentage of population age 75+ with primary schooling. Completed Primary
0.17
%
Percentage of female population age 15-19 with primary schooling. Total (Incomplete and Completed Primary)
0.05
%
Percentage of population age 15-19 with primary schooling. Total (Incomplete and Completed Primary)
32.78
%
Percentage of female population age 15+ with primary schooling. Total (Incomplete and Completed Primary)
6.86
%
Percentage of population age 15+ with primary schooling. Total (Incomplete and Completed Primary)
18.65
%
Percentage of female population age 20-24 with primary schooling. Total (Incomplete and Completed Primary)
3.78
%
Percentage of population age 20-24 with primary schooling. Total (Incomplete and Completed Primary)
12.45
%
Percentage of female population age 25-29 with primary schooling. Total (Incomplete and Completed Primary)
27.04
%
Percentage of population age 25-29 with primary schooling. Total (Incomplete and Completed Primary)
21.76
%
Percentage of female population age 25+ with primary schooling. Total (Incomplete and Completed Primary)
9.77
%
Percentage of population age 25+ with primary schooling. Total (Incomplete and Completed Primary)
15.81
%
Percentage of female population age 30-34 with primary schooling. Total (Incomplete and Completed Primary)
4.5
%
Percentage of population age 30-34 with primary schooling. Total (Incomplete and Completed Primary)
4.96
%
Percentage of female population age 35-39 with primary schooling. Total (Incomplete and Completed Primary)
7.25
%
Percentage of population age 35-39 with primary schooling. Total (Incomplete and Completed Primary)
18.96
%
Percentage of female population age 40-44 with primary schooling. Total (Incomplete and Completed Primary)
6.84
%
Percentage of population age 40-44 with primary schooling. Total (Incomplete and Completed Primary)
25.43
%
Percentage of female population age 45-49 with primary schooling. Total (Incomplete and Completed Primary)
6.27
%
Percentage of population age 45-49 with primary schooling. Total (Incomplete and Completed Primary)
17.75
%
Percentage of female population age 50-54 with primary schooling. Total (Incomplete and Completed Primary)
6.8
%
Percentage of population age 50-54 with primary schooling. Total (Incomplete and Completed Primary)
16.08
%
Percentage of female population age 55-59 with primary schooling. Total (Incomplete and Completed Primary)
3.3
%
Percentage of population age 55-59 with primary schooling. Total (Incomplete and Completed Primary)
12.3
%
Percentage of female population age 60-64 with primary schooling. Total (Incomplete and Completed Primary)
3.3
%
Percentage of population age 60-64 with primary schooling. Total (Incomplete and Completed Primary)
12.3
%
Percentage of female population age 65-69 with primary schooling. Total (Incomplete and Completed Primary)
0.9
%
Percentage of population age 65-69 with primary schooling. Total (Incomplete and Completed Primary)
6.21
%
Percentage of female population age 70-74 with primary schooling. Total (Incomplete and Completed Primary)
0.9
%
Percentage of population age 70-74 with primary schooling. Total (Incomplete and Completed Primary)
6.19
%
Percentage of female population age 75+ with primary schooling. Total (Incomplete and Completed Primary)
0.35
%
Percentage of population age 75+ with primary schooling. Total (Incomplete and Completed Primary)
3.99
%
Average years of primary schooling, age 15-19, total
3.55
Average years of primary schooling, age 15-19, female
2.45
Average years of primary schooling, age 15+, total
2.64
Average years of primary schooling, age 15+, female
1.27
Average years of primary schooling, age 20-24, total
2.64
Average years of primary schooling, age 20-24, female
1.29
Average years of primary schooling, age 25-29, total
3.93
Average years of primary schooling, age 25-29, female
1.92
Average years of primary schooling, age 25+, total
2.19
Average years of primary schooling, age 25+, female
0.81
Average years of primary schooling, age 30-34, total
2.48
Average years of primary schooling, age 30-34, female
1.26
Average years of primary schooling, age 35-39, total
2.27
Average years of primary schooling, age 35-39, female
0.94
Average years of primary schooling, age 40-44, total
2.51
Average years of primary schooling, age 40-44, female
0.92
Average years of primary schooling, age 45-49, total
1.52
Average years of primary schooling, age 45-49, female
0.54
Average years of primary schooling, age 50-54, total
1.28
Average years of primary schooling, age 50-54, female
0.44
Average years of primary schooling, age 55-59, total
0.95
Average years of primary schooling, age 55-59, female
0.22
Average years of primary schooling, age 60-64, total
0.95
Average years of primary schooling, age 60-64, female
0.22
Average years of primary schooling, age 65-69, total
0.36
Average years of primary schooling, age 65-69, female
0.06
Average years of primary schooling, age 70-74, total
0.37
Average years of primary schooling, age 70-74, female
0.06
Average years of primary schooling, age 75+, total
0.24
Average years of primary schooling, age 75+, female
0.03
Average years of total schooling, age 15-19, total
4.81
Average years of total schooling, age 15-19, female
4.13
Average years of total schooling, age 15+, total
3.85
Average years of total schooling, age 15+, female
1.97
Average years of total schooling, age 20-24, total
4.58
Average years of total schooling, age 20-24, female
2.33
Average years of total schooling, age 25-29, total
5.24
Average years of total schooling, age 25-29, female
2.16
Average years of total schooling, age 25+, total
3.23
Average years of total schooling, age 25+, female
1.16
Average years of total schooling, age 30-34, total
3.7
Average years of total schooling, age 30-34, female
1.81
Average years of total schooling, age 35-39, total
3.11
Average years of total schooling, age 35-39, female
1.37
Average years of total schooling, age 40-44, total
3.37
Average years of total schooling, age 40-44, female
1.31
Average years of total schooling, age 45-49, total
2.64
Average years of total schooling, age 45-49, female
0.94
Average years of total schooling, age 50-54, total
2.28
Average years of total schooling, age 50-54, female
0.75
Average years of total schooling, age 55-59, total
1.72
Average years of total schooling, age 55-59, female
0.37
Average years of total schooling, age 60-64, total
1.72
Average years of total schooling, age 60-64, female
0.37
Average years of total schooling, age 65-69, total
0.57
Average years of total schooling, age 65-69, female
0.1
Average years of total schooling, age 70-74, total
0.61
Average years of total schooling, age 70-74, female
0.1
Average years of total schooling, age 75+, total
0.39
Average years of total schooling, age 75+, female
0.04
Percentage of female population age 15-19 with secondary schooling. Completed Secondary
14.19
%
Percentage of population age 15-19 with secondary schooling. Completed Secondary
9.45
%
Percentage of female population age 15+ with secondary schooling. Completed Secondary
6.76
%
Percentage of population age 15+ with secondary schooling. Completed Secondary
8.65
%
Percentage of female population age 20-24 with secondary schooling. Completed Secondary
10.35
%
Percentage of population age 20-24 with secondary schooling. Completed Secondary
15.6
%
Percentage of female population age 25-29 with secondary schooling. Completed Secondary
0.03
%
Percentage of population age 25-29 with secondary schooling. Completed Secondary
13.21
%
Percentage of female population age 25+ with secondary schooling. Completed Secondary
1.67
%
Percentage of population age 25+ with secondary schooling. Completed Secondary
5.74
%
Percentage of female population age 30-34 with secondary schooling. Completed Secondary
5.22
%
Percentage of population age 30-34 with secondary schooling. Completed Secondary
10.67
%
Percentage of female population age 35-39 with secondary schooling. Completed Secondary
2.04
%
Percentage of population age 35-39 with secondary schooling. Completed Secondary
2.44
%
Percentage of female population age 40-44 with secondary schooling. Completed Secondary
2.48
%
Percentage of population age 40-44 with secondary schooling. Completed Secondary
3.09
%
Percentage of female population age 45-49 with secondary schooling. Completed Secondary
1.44
%
Percentage of population age 45-49 with secondary schooling. Completed Secondary
3.32
%
Percentage of female population age 50-54 with secondary schooling. Completed Secondary
0.51
%
Percentage of population age 50-54 with secondary schooling. Completed Secondary
2.1
%
Percentage of female population age 55-59 with secondary schooling. Completed Secondary
0.33
%
Percentage of population age 55-59 with secondary schooling. Completed Secondary
1.21
%
Percentage of female population age 60-64 with secondary schooling. Completed Secondary
0.32
%
Percentage of population age 60-64 with secondary schooling. Completed Secondary
1.2
%
Percentage of female population age 65-69 with secondary schooling. Completed Secondary
0.1
%
Percentage of population age 65-69 with secondary schooling. Completed Secondary
0.42
%
Percentage of female population age 70-74 with secondary schooling. Completed Secondary
0.11
%
Percentage of population age 70-74 with secondary schooling. Completed Secondary
0.46
%
Percentage of female population age 75+ with secondary schooling. Completed Secondary
0.06
%
Percentage of population age 75+ with secondary schooling. Completed Secondary
0.41
%
Percentage of female population age 15-19 with secondary schooling. Total (Incomplete and Completed Secondary)
40.09
%
Percentage of population age 15-19 with secondary schooling. Total (Incomplete and Completed Secondary)
28.64
%
Percentage of female population age 15+ with secondary schooling. Total (Incomplete and Completed Secondary)
12.39
%
Percentage of population age 15+ with secondary schooling. Total (Incomplete and Completed Secondary)
16.09
%
Percentage of female population age 20-24 with secondary schooling. Total (Incomplete and Completed Secondary)
15.78
%
Percentage of population age 20-24 with secondary schooling. Total (Incomplete and Completed Secondary)
24.82
%
Percentage of female population age 25-29 with secondary schooling. Total (Incomplete and Completed Secondary)
0.05
%
Percentage of population age 25-29 with secondary schooling. Total (Incomplete and Completed Secondary)
21.3
%
Percentage of female population age 25+ with secondary schooling. Total (Incomplete and Completed Secondary)
2.89
%
Percentage of population age 25+ with secondary schooling. Total (Incomplete and Completed Secondary)
9.9
%
Percentage of female population age 30-34 with secondary schooling. Total (Incomplete and Completed Secondary)
8.72
%
Percentage of population age 30-34 with secondary schooling. Total (Incomplete and Completed Secondary)
17.69
%
Percentage of female population age 35-39 with secondary schooling. Total (Incomplete and Completed Secondary)
3.59
%
Percentage of population age 35-39 with secondary schooling. Total (Incomplete and Completed Secondary)
4.28
%
Percentage of female population age 40-44 with secondary schooling. Total (Incomplete and Completed Secondary)
4.38
%
Percentage of population age 40-44 with secondary schooling. Total (Incomplete and Completed Secondary)
5.41
%
Percentage of female population age 45-49 with secondary schooling. Total (Incomplete and Completed Secondary)
2.54
%
Percentage of population age 45-49 with secondary schooling. Total (Incomplete and Completed Secondary)
5.86
%
Percentage of female population age 50-54 with secondary schooling. Total (Incomplete and Completed Secondary)
0.9
%
Percentage of population age 50-54 with secondary schooling. Total (Incomplete and Completed Secondary)
3.7
%
Percentage of female population age 55-59 with secondary schooling. Total (Incomplete and Completed Secondary)
0.6
%
Percentage of population age 55-59 with secondary schooling. Total (Incomplete and Completed Secondary)
2.2
%
Percentage of female population age 60-64 with secondary schooling. Total (Incomplete and Completed Secondary)
0.6
%
Percentage of population age 60-64 with secondary schooling. Total (Incomplete and Completed Secondary)
2.2
%
Percentage of female population age 65-69 with secondary schooling. Total (Incomplete and Completed Secondary)
0.2
%
Percentage of population age 65-69 with secondary schooling. Total (Incomplete and Completed Secondary)
0.8
%
Percentage of female population age 70-74 with secondary schooling. Total (Incomplete and Completed Secondary)
0.22
%
Percentage of population age 70-74 with secondary schooling. Total (Incomplete and Completed Secondary)
0.88
%
Percentage of female population age 75+ with secondary schooling. Total (Incomplete and Completed Secondary)
0.11
%
Percentage of population age 75+ with secondary schooling. Total (Incomplete and Completed Secondary)
0.81
%
Average years of secondary schooling, age 15-19, total
1.23
Average years of secondary schooling, age 15-19, female
1.67
Average years of secondary schooling, age 15+, total
1
Average years of secondary schooling, age 15+, female
0.63
Average years of secondary schooling, age 20-24, total
1.7
Average years of secondary schooling, age 20-24, female
0.96
Average years of secondary schooling, age 25-29, total
1.03
Average years of secondary schooling, age 25-29, female
0.13
Average years of secondary schooling, age 25+, total
0.76
Average years of secondary schooling, age 25+, female
0.25
Average years of secondary schooling, age 30-34, total
0.93
Average years of secondary schooling, age 30-34, female
0.43
Average years of secondary schooling, age 35-39, total
0.52
Average years of secondary schooling, age 35-39, female
0.28
Average years of secondary schooling, age 40-44, total
0.55
Average years of secondary schooling, age 40-44, female
0.27
Average years of secondary schooling, age 45-49, total
0.81
Average years of secondary schooling, age 45-49, female
0.3
Average years of secondary schooling, age 50-54, total
0.7
Average years of secondary schooling, age 50-54, female
0.21
Average years of secondary schooling, age 55-59, total
0.53
Average years of secondary schooling, age 55-59, female
0.11
Average years of secondary schooling, age 60-64, total
0.53
Average years of secondary schooling, age 60-64, female
0.11
Average years of secondary schooling, age 65-69, total
0.15
Average years of secondary schooling, age 65-69, female
0.03
Average years of secondary schooling, age 70-74, total
0.17
Average years of secondary schooling, age 70-74, female
0.03
Average years of secondary schooling, age 75+, total
0.11
Average years of secondary schooling, age 75+, female
0.01
Percentage of female population age 15-19 with tertiary schooling. Completed Tertiary
0.13
%
Percentage of population age 15-19 with tertiary schooling. Completed Tertiary
0.27
%
Percentage of female population age 15+ with tertiary schooling. Completed Tertiary
1.34
%
Percentage of population age 15+ with tertiary schooling. Completed Tertiary
3.65
%
Percentage of female population age 20-24 with tertiary schooling. Completed Tertiary
1.27
%
Percentage of population age 20-24 with tertiary schooling. Completed Tertiary
3.37
%
Percentage of female population age 25-29 with tertiary schooling. Completed Tertiary
2.09
%
Percentage of population age 25-29 with tertiary schooling. Completed Tertiary
5.28
%
Percentage of female population age 25+ with tertiary schooling. Completed Tertiary
1.98
%
Percentage of population age 25+ with tertiary schooling. Completed Tertiary
5.51
%
Percentage of female population age 30-34 with tertiary schooling. Completed Tertiary
2.41
%
Percentage of population age 30-34 with tertiary schooling. Completed Tertiary
5.65
%
Percentage of female population age 35-39 with tertiary schooling. Completed Tertiary
3.01
%
Percentage of population age 35-39 with tertiary schooling. Completed Tertiary
6.68
%
Percentage of female population age 40-44 with tertiary schooling. Completed Tertiary
2.38
%
Percentage of population age 40-44 with tertiary schooling. Completed Tertiary
6.53
%
Percentage of female population age 45-49 with tertiary schooling. Completed Tertiary
2.03
%
Percentage of population age 45-49 with tertiary schooling. Completed Tertiary
6.28
%
Percentage of female population age 50-54 with tertiary schooling. Completed Tertiary
1.9
%
Percentage of population age 50-54 with tertiary schooling. Completed Tertiary
6.16
%
Percentage of female population age 55-59 with tertiary schooling. Completed Tertiary
0.83
%
Percentage of population age 55-59 with tertiary schooling. Completed Tertiary
4.88
%
Percentage of female population age 60-64 with tertiary schooling. Completed Tertiary
0.85
%
Percentage of population age 60-64 with tertiary schooling. Completed Tertiary
5.01
%
Percentage of female population age 65-69 with tertiary schooling. Completed Tertiary
0.19
%
Percentage of population age 65-69 with tertiary schooling. Completed Tertiary
1.32
%
Percentage of female population age 70-74 with tertiary schooling. Completed Tertiary
0.22
%
Percentage of population age 70-74 with tertiary schooling. Completed Tertiary
1.45
%
Percentage of female population age 75+ with tertiary schooling. Completed Tertiary
0.08
%
Percentage of population age 75+ with tertiary schooling. Completed Tertiary
0.8
%
Percentage of female population age 15-19 with tertiary schooling. Total (Incomplete and Completed Tertiary)
0.68
%
Percentage of population age 15-19 with tertiary schooling. Total (Incomplete and Completed Tertiary)
1.38
%
Percentage of female population age 15+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
2.51
%
Percentage of population age 15+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
6.88
%
Percentage of female population age 20-24 with tertiary schooling. Total (Incomplete and Completed Tertiary)
2.88
%
Percentage of population age 20-24 with tertiary schooling. Total (Incomplete and Completed Tertiary)
8.2
%
Percentage of female population age 25-29 with tertiary schooling. Total (Incomplete and Completed Tertiary)
3.3
%
Percentage of population age 25-29 with tertiary schooling. Total (Incomplete and Completed Tertiary)
8.62
%
Percentage of female population age 25+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
2.98
%
Percentage of population age 25+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
8.27
%
Percentage of female population age 30-34 with tertiary schooling. Total (Incomplete and Completed Tertiary)
3.75
%
Percentage of population age 30-34 with tertiary schooling. Total (Incomplete and Completed Tertiary)
9.04
%
Percentage of female population age 35-39 with tertiary schooling. Total (Incomplete and Completed Tertiary)
4.27
%
Percentage of population age 35-39 with tertiary schooling. Total (Incomplete and Completed Tertiary)
9.59
%
Percentage of female population age 40-44 with tertiary schooling. Total (Incomplete and Completed Tertiary)
3.39
%
Percentage of population age 40-44 with tertiary schooling. Total (Incomplete and Completed Tertiary)
9.38
%
Percentage of female population age 45-49 with tertiary schooling. Total (Incomplete and Completed Tertiary)
3
%
Percentage of population age 45-49 with tertiary schooling. Total (Incomplete and Completed Tertiary)
8.99
%
Percentage of female population age 50-54 with tertiary schooling. Total (Incomplete and Completed Tertiary)
2.8
%
Percentage of population age 50-54 with tertiary schooling. Total (Incomplete and Completed Tertiary)
8.79
%
Percentage of female population age 55-59 with tertiary schooling. Total (Incomplete and Completed Tertiary)
1.3
%
Percentage of population age 55-59 with tertiary schooling. Total (Incomplete and Completed Tertiary)
7.1
%
Percentage of female population age 60-64 with tertiary schooling. Total (Incomplete and Completed Tertiary)
1.3
%
Percentage of population age 60-64 with tertiary schooling. Total (Incomplete and Completed Tertiary)
7.1
%
Percentage of female population age 65-69 with tertiary schooling. Total (Incomplete and Completed Tertiary)
0.3
%
Percentage of population age 65-69 with tertiary schooling. Total (Incomplete and Completed Tertiary)
1.9
%
Percentage of female population age 70-74 with tertiary schooling. Total (Incomplete and Completed Tertiary)
0.33
%
Percentage of population age 70-74 with tertiary schooling. Total (Incomplete and Completed Tertiary)
2.09
%
Percentage of female population age 75+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
0.13
%
Percentage of population age 75+ with tertiary schooling. Total (Incomplete and Completed Tertiary)
1.16
%
Average years of tertiary schooling, age 15-19, total
0.03
Average years of tertiary schooling, age 15-19, female
0.02
Average years of tertiary schooling, age 15+, total
0.21
Average years of tertiary schooling, age 15+, female
0.08
Average years of tertiary schooling, age 20-24, total
0.23
Average years of tertiary schooling, age 20-24, female
0.08
Average years of tertiary schooling, age 25-29, total
0.28
Average years of tertiary schooling, age 25-29, female
0.11
Average years of tertiary schooling, age 25+, total
0.28
Average years of tertiary schooling, age 25+, female
0.1
Average years of tertiary schooling, age 30-34, total
0.29
Average years of tertiary schooling, age 30-34, female
0.12
Average years of tertiary schooling, age 35-39, total
0.33
Average years of tertiary schooling, age 35-39, female
0.15
Average years of tertiary schooling, age 40-44, total
0.32
Average years of tertiary schooling, age 40-44, female
0.12
Average years of tertiary schooling, age 45-49, total
0.31
Average years of tertiary schooling, age 45-49, female
0.1
Average years of tertiary schooling, age 50-54, total
0.3
Average years of tertiary schooling, age 50-54, female
0.09
Average years of tertiary schooling, age 55-59, total
0.24
Average years of tertiary schooling, age 55-59, female
0.04
Average years of tertiary schooling, age 60-64, total
0.24
Average years of tertiary schooling, age 60-64, female
0.04
Average years of tertiary schooling, age 65-69, total
0.06
Average years of tertiary schooling, age 65-69, female
0.01
Average years of tertiary schooling, age 70-74, total
0.07
Average years of tertiary schooling, age 70-74, female
0.01
Average years of tertiary schooling, age 75+, total
0.04
Average years of tertiary schooling, age 75+, female
0
1.69
3.59
0
2.3
2.47
1.78
0.9075
0
2.23
1.42
17.95
11.03
32.54
14.38
12.3
14.89
24.64
40.59
15.63
37.24
80.37
85.38
67.46
83.33
85.24
83.33
74.45
59.41
82.13
61.34
2
2
4
2
3
2
2
2
3
1
1
3
2
2
2
2
2
2
1
1
1
2
2
Literacy rate, youth female (% of females ages 15-24)
32.11
%
Ratio of young literate females to males (% ages 15-24)
0.519
%
Literacy rate, youth male (% of males ages 15-24)
61.88
%
Literacy rate, youth total (% of people ages 15-24)
46.99
%
Literacy rate, adult male (% of males ages 15 and above)
45.42
%
Literacy rate, adult total (% of people ages 15 and above)
31.74
%
Duration of compulsory education (years)
9
years
Ratio of female to male primary enrollment
0.692
%
Ratio of female to male secondary enrollment
0.5624
%
Ratio of female to male tertiary enrollment
0.2765
%
Preprimary education, duration (years)
2
years
Enrolment in pre-primary education, both sexes
24220
Persons
Enrolment in pre-primary education, female
10383
Persons
Percentage of students in pre-primary education who are female
42.87
%
Pupil-teacher ratio in pre-primary education (headcount basis)
7.23
School enrollment, preprimary (% gross)
0.7594
%
School enrollment, preprimary, female (% gross)
0.6686
%
School enrollment, preprimary, male (% gross)
0.8456
%
0
%
Teachers in pre-primary education, both sexes
3351
Persons
Teachers in pre-primary education, female
3351
Persons
Percentage of teachers in pre-primary education who are female
100
%
Primary school starting age (years)
7
years
Primary completion rate, female, based on completers
49.01
%
Primary completion rate, male, based on completers
73.87
%
Primary completion rate, total, based on completers
61.79
%
Primary completion rate, female
15.11
%
Primary completion rate, male
42.82
%
Educational attainment, at least completed primary, population 25+ years, female (cumulative)
0.9393
%
Educational attainment, at least completed primary, population 25+ years, male (cumulative)
7.91
%
Educational attainment, at least completed primary, population 25+ years, total (cumulative)
4.48
%
Cumulative drop-out rate to the last grade of primary education, female
95.59
%
Cumulative drop-out rate to the last grade of primary education, male
99.9
%
Cumulative drop-out rate to the last grade of primary education, both sexes
24.43
%
Primary education, duration (years)
6
years
Primary education, pupils
6333695
Enrolment in primary education, female
2511598
Persons
Primary education, pupils (% female)
39.65
%
Pupil-teacher ratio, primary
44.33
School enrollment, primary (% gross)
112
%
School enrollment, primary, female (% gross)
91.08
%
School enrollment, primary, male (% gross)
132
%
Gross intake rate in grade 1, female
93.49
%
Gross intake rate in grade 1, male
137
%
Gross intake rate in grade 1, total
116
%
School enrollment, primary (% net)
28.65
%
School enrollment, primary, female (% net)
14.64
%
School enrollment, primary, male (% net)
41.6
%
Net intake rate in grade 1, female (% of official school-age population)
69.21
%
Net intake rate in grade 1, male (% of official school-age population)
92.36
%
Net intake rate in grade 1 (% of official school-age population)
81.09
%
Over-age students, primary, female (% of female enrollment)
5.4
%
Over-age students, primary, male (% of male enrollment)
5.91
%
Over-age students, primary (% of enrollment)
5.71
%
School enrollment, primary, private (% of total primary)
3.47
%
Persistence to grade 5, female (% of cohort)
8.24
%
Persistence to grade 5, male (% of cohort)
0.3777
%
Persistence to grade 5, total (% of cohort)
81.95
%
Persistence to last grade of primary, female (% of cohort)
4.41
%
Persistence to last grade of primary, male (% of cohort)
0.1015
%
Persistence to last grade of primary, total (% of cohort)
75.57
%
Repeaters, primary, female (% of female enrollment)
9.17
%
Repeaters, primary, male (% of male enrollment)
8.94
%
Repeaters, primary, total (% of total enrollment)
9
%
Primary education, teachers
142880
Teachers in primary education, female
49358
Persons
Primary education, teachers (% female)
34.55
%
Total enrollment, primary (% net)
28.65
%
Total enrollment, primary, female (% net)
14.64
%
Total enrollment, primary, male (% net)
41.6
%
Children out of school, primary
1801311
Children out of school, primary, female
1034842
Children out of school, female (% of female primary school age)
85.36
%
Children out of school, primary, male
766469
Children out of school, male (% of male primary school age)
58.4
%
Children out of school (% of primary school age)
71.35
%
Secondary school starting age (years)
13
years
Lower secondary completion rate, female
9.49
%
Lower secondary completion rate, male
24.13
%
Lower secondary completion rate, total
17.05
%
Educational attainment, at least completed lower secondary, population 25+, female (cumulative)
0.8031
%
Educational attainment, at least completed lower secondary, population 25+, male (cumulative)
7.39
%
Educational attainment, at least completed lower secondary, population 25+, total (cumulative)
4.15
%
Educational attainment, at least completed post-secondary, population 25+, female (cumulative)
0.5438
%
Educational attainment, at least completed post-secondary, population 25+, male (cumulative)
5.42
%
Educational attainment, at least completed post-secondary, population 25+, total (cumulative)
3.02
%
Educational attainment, at least completed upper secondary, population 25+, female (cumulative)
1.1
%
Educational attainment, at least completed upper secondary, population 25+, male (cumulative)
4.55
%
Educational attainment, at least completed upper secondary, population 25+, total (cumulative)
3
%
Secondary education, duration (years)
6
years
Theoretical duration of lower secondary education (years)
3
years
Theoretical duration of upper secondary education (years)
3
years
Secondary education, pupils
2698816
Enrolment in secondary education, female
936446
Persons
Percentage of female students in secondary education enrolled in vocational programmes, female
0.2806
%
Secondary education, pupils (% female)
34.7
%
Secondary education, general pupils
2671830
Enrolment in secondary general, female
933818
Persons
Secondary education, general pupils (% female)
34.95
%
Pupil-teacher ratio, lower secondary
43.9
Percentage of male students in secondary education enrolled in vocational programmes, male
1.38
%
Pupil-teacher ratio, secondary
37.72
Pupil-teacher ratio, upper secondary
30.28
Secondary education, vocational pupils
26986
Enrolment in secondary vocational, female
2628
Persons
Secondary education, vocational pupils (% female)
9.74
%
Percentage of students in secondary education enrolled in vocational programmes, both sexes
0.9999
%
School enrollment, secondary (% gross)
55.64
%
School enrollment, secondary, female (% gross)
39.74
%
Gross enrolment ratio, lower secondary, both sexes
67.45
%
Gross enrolment ratio, lower secondary, female
49.58
%
Gross enrolment ratio, lower secondary, male
84.33
%
School enrollment, secondary, male (% gross)
70.67
%
Gross enrolment ratio, upper secondary, both sexes
42.61
%
Gross enrolment ratio, upper secondary, female
28.88
%
Gross enrolment ratio, upper secondary, male
55.59
%
School enrollment, secondary (% net)
48.88
%
School enrollment, secondary, female (% net)
35.63
%
School enrollment, secondary, male (% net)
61.39
%
School enrollment, secondary, private (% of total secondary)
2.67
%
Progression to secondary school, female
84.24
%
Progression to secondary school, male
91.71
%
Progression to secondary school
89.53
%
Repeaters, secondary, female (% of female enrollment)
5.81
%
Repeaters, secondary, male (% of male enrollment)
6.06
%
Repeaters, secondary, total (% of total enrollment)
5.99
%
Secondary education, teachers
71547
Secondary education, teachers, female
23789
Secondary education, teachers (% female)
33.25
%
Adolescents out of school, female (% of female lower secondary school age)
50.31
%
Adolescents out of school, male (% of male lower secondary school age)
18.65
%
Adolescents out of school (% of lower secondary school age)
34.03
%
Enrolment in tertiary education, all programmes, both sexes
262874
Persons
Enrolment in tertiary education, all programmes, female
53613
Persons
Percentage of students in tertiary education who are female
20.39
%
Pupil-teacher ratio, tertiary
23.89
School enrollment, tertiary (% gross)
8.66
%
School enrollment, tertiary, female (% gross)
3.67
%
School enrollment, tertiary, male (% gross)
13.29
%
Graduates from tertiary education, both sexes
24315
Persons
Percentage of female graduates from tertiary education graduating from Agriculture programmes, female
1.86
%
Percentage of graduates from tertiary education graduating from Agriculture programmes, both sexes
9.99
%
Percentage of female graduates from tertiary education graduating from Education programmes, female
22.51
%
Percentage of graduates from tertiary education graduating from Education programmes, both sexes
17.75
%
Percentage of female graduates from tertiary education graduating from Engineering, Manufacturing and Construction programmes, female
1.84
%
Percentage of graduates from tertiary education graduating from Engineering, Manufacturing and Construction programmes, both sexes
8.25
%
Graduates from tertiary education, female
4451
Persons
Female share of graduates in agriculture
3.42
%
Female share of graduates in education
23.22
%
Female share of graduates in engineering, manufacturing and construction
4.09
%
Female share of graduates in health and welfare
32.34
%
Female share of graduates in humanities and arts
28.22
%
Female share of graduates in unknown or unspecified fields
41.19
%
Female share of graduates in science
19.64
%
Female share of graduates in social science, business and law
16.26
%
Percentage of graduates from tertiary education who are female
18.31
%
Percentage of female graduates from tertiary education graduating from Health and Welfare programmes, female
7.53
%
Percentage of graduates from tertiary education graduating from Health and Welfare programmes, both sexes
4.26
%
Percentage of female graduates from tertiary education graduating from Humanities and Arts programmes, female
19.61
%
Percentage of graduates from tertiary education graduating from Humanities and Arts programmes, both sexes
12.72
%
Percentage of female graduates from tertiary education graduating from programmes in unspecified fields, female
6.2
%
Percentage of graduates from tertiary education graduating from programmes in unspecified fields, both sexes
2.76
%
Percentage of female graduates from tertiary education graduating from Science programmes, female
6.43
%
Percentage of graduates from tertiary education graduating from Science programmes, both sexes
5.99
%
Percentage of female graduates from tertiary education graduating from Social Sciences, Business and Law programmes, female
34.01
%
Percentage of graduates from tertiary education graduating from Social Sciences, Business and Law programmes, both sexes
38.29
%
Percentage of enrolment in tertiary education in private institutions
41.78
%
Teachers in tertiary education, both sexes
11002
Persons
Teachers in tertiary education programmes, female
1180
Persons
Tertiary education; teachers (% female)
10.73
%
Gross enrolment ratio, primary to tertiary, both sexes
69.52
%
Current education expenditure, primary (% of total expenditure in primary public institutions)
84.52
%
Current education expenditure, secondary (% of total expenditure in secondary public institutions)
84.52
%
Current education expenditure, tertiary (% of total expenditure in tertiary public institutions)
68.05
%
Current education expenditure, total (% of total expenditure in public institutions)
80.41
%
Current expenditure as % of total expenditure in public institutions
80.41
%
All education staff compensation, primary (% of total expenditure in primary public institutions)
78.35
%
All education staff compensation, secondary (% of total expenditure in secondary public institutions)
78.35
%
All education staff compensation, tertiary (% of total expenditure in tertiary public institutions)
43.72
%
All education staff compensation, total (% of total expenditure in public institutions)
71.45
%
Expenditure per student, primary (% of GDP per capita)
8.15
%
Expenditure on primary as % of government expenditure on education
56.7
%
Expenditure per student, secondary (% of GDP per capita)
8.22
%
Expenditure on secondary as % of government expenditure on education
24.36
%
Expenditure per student, tertiary (% of GDP per capita)
40.93
%
Expenditure on tertiary as % of government expenditure on education
15.95
%
Public spending on education, total (% of government expenditure)
12.51
%
Public spending on education, total (% of GDP)
3.32
%
Labor force, female
17.34
%
Labor force, total
10937017
Unemployment, female
12.7
%
Unemployment, male
7.7
%
Unemployment, total
8.5
%
Population of the official age for pre-primary education, female
973184
Persons
Population of the official age for pre-primary education, both sexes
1992448
Persons
Population of the official age for pre-primary education, male
1019264
Persons
Population of the official age for the last grade of primary education, female
434835
Persons
Population of the official age for the last grade of primary education, male
460464
Persons
Population of the official age for the last grade of primary education, both sexes
895299
Persons
Population of the official age for primary education, female
2757475
Persons
Population of the official age for primary education, both sexes
5661298
Persons
Population of the official age for primary education, male
2903823
Persons
Population of the official age for lower secondary education, female
1236409
Persons
Population of the official age for lower secondary education, both sexes
2544975
Persons
Population of the official age for lower secondary education, male
1308566
Persons
Population of the official age for secondary education, female
2356272
Persons
Population of the official age for secondary education, both sexes
4850112
Persons
Population of the official age for secondary education, male
2493840
Persons
Population of the official age for upper secondary education, female
1119863
Persons
Population of the official age for upper secondary education, both sexes
2305137
Persons
Population of the official age for upper secondary education, male
1185274
Persons
Population of the official age for tertiary education, female
1540877
Persons
Population of the official age for tertiary education, both sexes
3199607
Persons
Population of the official age for tertiary education, male
1658730
Persons
Primary completion rate, gender parity index
0.3529
GPI
Gross intake ratio to Grade 1 of primary education, gender parity index
0.7048
GPI
Gross intake ratio to Grade 1 of lower secondary general education, both sexes
18.92
%
Gross intake ratio to Grade 1 of lower secondary general education, female
10.23
%
Lower secondary completion rate, gender parity index
0.3935
GPI
Gross intake ratio to Grade 1 of lower secondary general education, gender parity index
0.3805
GPI
Gross intake ratio to Grade 1 of lower secondary general education, male
26.89
%
Official entrance age to compulsory education (years)
7
years
Drop-out rate from Grade 1 of primary education, both sexes
1.77
%
Drop-out rate from Grade 1 of primary education, female
36.25
%
Drop-out rate from Grade 1 of primary education, male
2.99
%
Drop-out rate from Grade 2 of primary education, both sexes
8.72
%
Drop-out rate from Grade 2 of primary education, female
6.69
%
Drop-out rate from Grade 2 of primary education, male
10.09
%
Drop-out rate from Grade 3 of primary education, both sexes
1.53
%
Drop-out rate from Grade 3 of primary education, female
1.53
%
Drop-out rate from Grade 3 of primary education, male
1.53
%
Drop-out rate from Grade 4 of primary education, both sexes
1.87
%
Drop-out rate from Grade 4 of primary education, female
1.86
%
Drop-out rate from Grade 4 of primary education, male
1.88
%
Drop-out rate from Grade 5 of primary education, both sexes
1.55
%
Drop-out rate from Grade 5 of primary education, female
1.56
%
Drop-out rate from Grade 5 of primary education, male
1.55
%
Cumulative drop-out rate to the last grade of lower secondary general education, female
6.05
%
Drop-out rate from Grade 1 of lower secondary general education, female
67.46
%
Drop-out rate from Grade 1 of lower secondary general education, male
18.74
%
Drop-out rate from Grade 1 of lower secondary general education, both sexes
40.75
%
Drop-out rate from Grade 2 of lower secondary general education, female
2.74
%
Drop-out rate from Grade 2 of lower secondary general education, male
2.68
%
Drop-out rate from Grade 2 of lower secondary general education, both sexes
2.69
%
Cumulative drop-out rate to the last grade of lower secondary general education, male
6.01
%
Cumulative drop-out rate to the last grade of lower secondary general education, both sexes
6.02
%
Enrolment in Grade 1 of primary education, both sexes
1159427
Persons
Enrolment in Grade 1 of primary education, female
465590
Persons
Enrolment in Grade 2 of primary education, both sexes
1242426
Persons
Enrolment in Grade 2 of primary education, female
504440
Persons
Enrolment in Grade 3 of primary education, both sexes
1138890
Persons
Enrolment in Grade 3 of primary education, female
465745
Persons
Enrolment in Grade 4 of primary education, both sexes
1053087
Persons
Enrolment in Grade 4 of primary education, female
422782
Persons
Enrolment in Grade 5 of primary education, both sexes
870891
Persons
Enrolment in Grade 5 of primary education, female
339244
Persons
Enrolment in Grade 6 of primary education, both sexes
753035
Persons
Enrolment in Grade 6 of primary education, female
286670
Persons
Enrolment in primary education, private institutions, both sexes
154054
Persons
Enrolment in primary education, public institutions, both sexes
6063702
Persons
Enrolment in primary education, public institutions, female
2436596
Persons
Enrolment in lower secondary education, both sexes
1633965
Persons
Enrolment in lower secondary education, female
583665
Persons
Enrolment in lower secondary general, both sexes
1633965
Persons
Enrolment in lower secondary general, female
583665
Persons
Enrolment in Grade 1 of lower secondary general education, female
238935
Persons
Enrolment in Grade 1 of lower secondary general education, both sexes
652756
Persons
Enrolment in Grade 2 of lower secondary general education, female
190716
Persons
Enrolment in Grade 2 of lower secondary general education, both sexes
534503
Persons
Enrolment in Grade 3 of lower secondary general education, female
154014
Persons
Enrolment in Grade 3 of lower secondary general education, both sexes
446706
Persons
Enrolment in lower secondary education, private institutions, both sexes
35803
Persons
Enrolment in lower secondary education, private institutions, female
8913
Persons
Enrolment in lower secondary education, public institutions, both sexes
1598162
Persons
Enrolment in lower secondary education, public institutions, female
574752
Persons
Enrolment in secondary education, private institutions, both sexes
51469
Persons
Enrolment in secondary education, private institutions, female
13018
Persons
Enrolment in secondary education, public institutions, both sexes
2551265
Persons
Enrolment in secondary education, public institutions, female
888088
Persons
Enrolment in upper secondary education, both sexes
968769
Persons
Enrolment in upper secondary education, female
317441
Persons
Enrolment in upper secondary general, both sexes
943750
Persons
Enrolment in upper secondary general, female
315519
Persons
Enrolment in upper secondary education, private institutions, both sexes
15666
Persons
Enrolment in upper secondary education, private institutions, female
4105
Persons
Enrolment in upper secondary education, public institutions, both sexes
953103
Persons
Enrolment in upper secondary education, public institutions, female
313336
Persons
Enrolment in upper secondary vocational, both sexes
25019
Persons
Enrolment in upper secondary vocational, female
1922
Persons
Enrolment in post-secondary non-tertiary education, both sexes
145220
Persons
Enrolment in post-secondary non-tertiary education, female
60346
Persons
Enrolment in post-secondary non-tertiary education, private institutions, both sexes
7854
Persons
Enrolment in post-secondary non-tertiary education, private institutions, female
5433
Persons
Enrolment in post-secondary non-tertiary education, public institutions, both sexes
137366
Persons
Enrolment in post-secondary non-tertiary education, public institutions, female
54913
Persons
Enrolment in tertiary education, ISCED 5 programmes, both sexes
37329
Persons
Enrolment in tertiary education, ISCED 5 programmes, female
4139
Persons
Enrolment in tertiary education, ISCED 6 programmes, both sexes
260330
Persons
Enrolment in tertiary education, ISCED 6 programmes, female
53240
Persons
Enrolment in tertiary education, ISCED 7 programmes, both sexes
2525
Persons
Enrolment in tertiary education, ISCED 7 programmes, female
368
Persons
Enrolment in tertiary education, ISCED 8 programmes, both sexes
19
Persons
Enrolment in tertiary education, ISCED 8 programmes, female
5
Persons
4.48
%
0.9393
%
7.91
%
4.15
%
0.8031
%
7.39
%
3
%
1.1
%
4.55
%
3.02
%
0.5438
%
5.42
%
Mean years of schooling of the population age 25+. Total
0.8
Mean years of schooling of the population age 25+. Female
0.2
Mean years of schooling of the population age 25+. Male
1.4
Early school leavers from primary education, female
15970
Persons
Early school leavers from primary education, male
27151
Persons
Early school leavers from primary education, both sexes
43121
Persons
Percentage of students in lower secondary education who are female
35.72
%
Percentage of students in lower secondary general education who are female
35.72
%
Percentage of students in upper secondary education who are female
32.77
%
Percentage of students in upper secondary general education who are female
33.43
%
Percentage of students in upper secondary vocational education who are female
7.68
%
Percentage of students in post-secondary non-tertiary education who are female
41.55
%
Percentage of students in post-secondary non-tertiary general education who are female
46.87
%
Percentage of students in post-secondary non-tertiary vocational education who are female
41.16
%
Percentage of students in tertiary ISCED 5 programmes who are female
11.09
%
Percentage of students enrolled in Education programmes in tertiary education who are female
23.51
%
Percentage of students enrolled in Humanities and Arts programmes in tertiary education who are female
24.97
%
Percentage of students enrolled in Social Sciences, Business and Law programmes in tertiary education who are female
18.91
%
Percentage of students enrolled in Science programmes in tertiary education who are female
18.65
%
Percentage of students enrolled in Engineering, Manufacturing and Construction programmes in tertiary education who are female
6.38
%
Percentage of students enrolled in Agriculture programmes in tertiary education who are female
6.2
%
Percentage of students enrolled in Health and Welfare programmes in tertiary education who are female
33.82
%
Percentage of students enrolled in programmes in unspecified fields in tertiary education who are female
23.58
%
Percentage of students in tertiary ISCED 6 programmes who are female
20.45
%
Percentage of students in tertiary ISCED 7 programmes who are female
14.57
%
Percentage of students in tertiary ISCED 8 programmes who are female
26.32
%
Percentage of graduates from Science and Technology programmes in tertiary education who are female
10.63
%
Percentage of graduates from tertiary ISCED 6 programmes who are female
18.39
%
Percentage of graduates from tertiary ISCED 7 programmes who are female
9.01
%
New entrants to Grade 1 of primary education, percentage female
40.16
%
Out-of-school children of primary school age, percentage female
57.45
%
Out-of-school adolescents of lower secondary school age, percentage female
71.71
%
Percentage of students in tertiary education enrolled in Education programmes, both sexes
14.75
%
Percentage of female students in tertiary education enrolled in Education programmes, female
17.01
%
Percentage of male students in tertiary education enrolled in Education programmes, male
14.17
%
Percentage of students in tertiary education enrolled in Humanities and Arts programmes, both sexes
8.37
%
Percentage of female students in tertiary education enrolled in Humanities and Arts programmes, female
10.25
%
Percentage of male students in tertiary education enrolled in Humanities and Arts programmes, male
7.89
%
Percentage of students in tertiary education enrolled in Social Sciences, Business and Law programmes, both sexes
41.04
%
Percentage of female students in tertiary education enrolled in Social Sciences, Business and Law programmes, female
38.05
%
Percentage of male students in tertiary education enrolled in Social Sciences, Business and Law programmes, male
41.81
%
Percentage of students in tertiary education enrolled in Science programmes, both sexes
5.48
%
Percentage of female students in tertiary education enrolled in Science programmes, female
5.02
%
Percentage of male students in tertiary education enrolled in Science programmes, male
5.6
%
Percentage of students in tertiary education enrolled in Engineering, Manufacturing and Construction programmes, both sexes
5.9
%
Percentage of female students in tertiary education enrolled in Engineering, Manufacturing and Construction programmes, female
1.84
%
Percentage of male students in tertiary education enrolled in Engineering, Manufacturing and Construction programmes, male
6.93
%
Percentage of students in tertiary education enrolled in Agriculture programmes, both sexes
6.43
%
Percentage of female students in tertiary education enrolled in Agriculture programmes, female
1.95
%
Percentage of male students in tertiary education enrolled in Agriculture programmes, male
7.57
%
Percentage of students in tertiary education enrolled in Health and Welfare programmes, both sexes
10.03
%
Percentage of female students in tertiary education enrolled in Health and Welfare programmes, female
16.63
%
Percentage of male students in tertiary education enrolled in Health and Welfare programmes, male
8.34
%
Percentage of students in tertiary education enrolled in programmes in unspecified fields, both sexes
8
%
Percentage of female students in tertiary education enrolled in programmes in unspecified fields, female
9.25
%
Percentage of male students in tertiary education enrolled in programmes in unspecified fields, male
7.68
%
Percentage of male graduates from tertiary education graduating from Education programmes, male
16.68
%
Percentage of male graduates from tertiary education graduating from Humanities and Arts programmes, male
11.18
%
Percentage of male graduates from tertiary education graduating from Social Sciences, Business and Law programmes, male
39.24
%
Percentage of male graduates from tertiary education graduating from Science programmes, male
5.89
%
Percentage of male graduates from tertiary education graduating from Engineering, Manufacturing and Construction programmes, male
9.68
%
Percentage of male graduates from tertiary education graduating from Agriculture programmes, male
11.81
%
Percentage of male graduates from tertiary education graduating from Health and Welfare programmes, male
3.53
%
Percentage of male graduates from tertiary education graduating from programmes in unspecified fields, male
1.98
%
Percentage of teachers in lower secondary education who are female
31
%
Percentage of teachers in upper secondary education who are female
27.32
%
Percentage of teachers in post-secondary non-tertiary education who are female
13.1
%
Graduates from ISCED 6 programmes in tertiary education, female
4431
Persons
Graduates from ISCED 6 programmes in tertiary education, both sexes
24093
Persons
Graduates from ISCED 7 programmes in tertiary education, female
20
Persons
Graduates from ISCED 7 programmes in tertiary education, both sexes
222
Persons
Gross enrolment ratio, pre-primary, gender parity index
0.7907
GPI
Gross enrolment ratio, primary and lower secondary, both sexes
97.73
%
Gross enrolment ratio, primary and lower secondary, female
78.51
%
Gross enrolment ratio, primary and lower secondary, gender parity index
0.6772
GPI
Gross enrolment ratio, primary and lower secondary, male
116
%
Gross enrolment ratio, primary and secondary, both sexes
86.13
%
Gross enrolment ratio, primary and secondary, female
68
%
Gross enrolment ratio, primary and secondary, male
103
%
Gross enrolment ratio, primary to tertiary, female
54.35
%
Gross enrolment ratio, primary to tertiary, gender parity index
0.6486
GPI
Gross enrolment ratio, primary to tertiary, male
83.8
%
Gross enrolment ratio, lower secondary, gender parity index
0.5877
GPI
Gross enrolment ratio, upper secondary, gender parity index
0.517
GPI
Gross enrolment ratio, post-secondary non-tertiary, both sexes
11.15
%
Gross enrolment ratio, post-secondary non-tertiary, female
9.6
%
Gross enrolment ratio, post-secondary non-tertiary, gender parity index
0.7622
GPI
Gross enrolment ratio, post-secondary non-tertiary, male
12.6
%
Gross graduation ratio from primary education, gender parity index
0.6634
GPI
Gross graduation ratio from lower secondary education, both sexes
41.6
%
Gross lower secondary graduation ratio. All programmes. Female
30.14
%
Gross graduation ratio from lower secondary education, gender parity index
0.5746
GPI
Gross lower secondary graduation ratio. All programmes. Male
52.45
%
Gross outbound enrolment ratio, all regions, both sexes
0.4228
%
Percentage of students in lower secondary education enrolled in general programmes, both sexes
100
%
Percentage of female students in lower secondary education enrolled in general programmes, female
100
%
Percentage of male students in lower secondary education enrolled in general programmes, male
100
%
Percentage of students in secondary education enrolled in general programmes, both sexes
99.04
%
Percentage of female students in secondary education enrolled in general programmes, female
99.79
%
Percentage of male students in secondary education enrolled in general programmes, male
98.64
%
Percentage of students in upper secondary education enrolled in general programmes, both sexes
97.42
%
Percentage of female students in upper secondary education enrolled in general programmes, female
99.39
%
Percentage of male students in upper secondary education enrolled in general programmes, male
96.45
%
Percentage of students in upper secondary education enrolled in vocational programmes, both sexes
2.58
%
Percentage of female students in upper secondary education enrolled in vocational programmes, female
0.6055
%
Percentage of male students in upper secondary education enrolled in vocational programmes, male
3.55
%
Percentage of students in post-secondary non-tertiary education enrolled in general programmes, both sexes
6.95
%
Percentage of female students in post-secondary non-tertiary education enrolled in general programmes, female
7.83
%
Percentage of male students in post-secondary non-tertiary education enrolled in general programmes, male
6.31
%
Percentage of students in post-secondary non-tertiary education enrolled in vocational programmes, both sexes
93.05
%
Percentage of female students in post-secondary non-tertiary education enrolled in vocational programmes, female
92.17
%
Percentage of male students in post-secondary non-tertiary education enrolled in vocational programmes, male
93.69
%
Youth illiterate population, 15-24 years, both sexes
2947366
Persons
Youth illiterate population, 15-24 years, female
1840733
Persons
Youth illiterate population, 15-24 years, male
1106633
Persons
Adult illiterate population, 15+ years, both sexes
10372565
Persons
Adult illiterate population, 15+ years, female
6086596
Persons
Adult illiterate population, 15+ years, male
4285969
Persons
Elderly illiterate population, 65+ years, both sexes
282648
Persons
Elderly illiterate population, 65+ years, female
281873
Persons
Elderly illiterate population, 65+ years, male
130483
Persons
Youth illiterate population, 15-24 years, % female
62.45
%
Adult illiterate population, 15+ years, % female
58.68
%
Elderly illiterate population, 65+ years, % female
53.84
%
Adult literacy rate, population 15+ years, gender parity index
0.3878
GPI
Elderly literacy rate, population 65+ years, both sexes
20.32
%
Elderly literacy rate, population 65+ years, female
19.67
%
Elderly literacy rate, population 65+ years, gender parity index
0.0516
GPI
Elderly literacy rate, population 65+ years, male
11.36
%
Net flow of internationally mobile students (inbound - outbound), both sexes
-5
Persons
Net flow ratio of internationally mobile students (inbound - outbound), both sexes
-5.83
%
Net attendance rate, primary, both sexes
51.49
%
Net attendance rate, primary, female
43.36
%
Net attendance rate, primary, gender parity index
0.739
GPI
Net attendance rate, primary, male
58.67
%
Net attendance rate, primary, poorest quintile, both sexes
39.4
%
Net attendance rate, primary, poorest quintile, female
29.72
%
Net attendance rate, primary, poorest quintile, gender parity index
0.6235
GPI
Net attendance rate, primary, poorest quintile, male
47.66
%
Net attendance rate, primary, second quintile, both sexes
44.63
%
Net attendance rate, primary, second quintile, female
35.68
%
Net attendance rate, primary, second quintile, gender parity index
0.6841
GPI
Net attendance rate, primary, second quintile, male
52.15
%
Net attendance rate, primary, middle quintile, both sexes
48.64
%
Net attendance rate, primary, middle quintile, female
38.56
%
Net attendance rate, primary, middle quintile, gender parity index
0.6742
GPI
Net attendance rate, primary, middle quintile, male
57.19
%
Net attendance rate, primary, fourth quintile, both sexes
57.38
%
Net attendance rate, primary, fourth quintile, female
48.97
%
Net attendance rate, primary, fourth quintile, gender parity index
0.7499
GPI
Net attendance rate, primary, fourth quintile, male
65.31
%
Net attendance rate, primary, richest quintile, both sexes
68.6
%
Net attendance rate, primary, richest quintile, female
63.8
%
Net attendance rate, primary, richest quintile, gender parity index
0.8725
GPI
Net attendance rate, primary, richest quintile, male
73.12
%
Net attendance rate, primary, rural, both sexes
48.03
%
Net attendance rate, primary, rural, female
38.81
%
Net attendance rate, primary, rural, gender parity index
0.6922
GPI
Net attendance rate, primary, rural, male
56.06
%
Net attendance rate, primary, urban, both sexes
67.57
%
Net attendance rate, primary, urban, female
63.62
%
Net attendance rate, primary, urban, gender parity index
0.892
GPI
Net attendance rate, primary, urban, male
71.32
%
Net attendance rate, lower secondary, both sexes
29.16
%
Net attendance rate, lower secondary, female
20.27
%
Net attendance rate, lower secondary, gender parity index
0.5417
GPI
Net attendance rate, lower secondary, male
37.42
%
Net attendance rate, lower secondary, poorest quintile, both sexes
14.83
%
Net attendance rate, lower secondary, poorest quintile, female
5.88
%
Net attendance rate, lower secondary, poorest quintile, gender parity index
0.2671
GPI
Net attendance rate, lower secondary, poorest quintile, male
22.03
%
Net attendance rate, lower secondary, second quintile, both sexes
21.4
%
Net attendance rate, lower secondary, second quintile, female
11.41
%
Net attendance rate, lower secondary, second quintile, gender parity index
0.3759
GPI
Net attendance rate, lower secondary, second quintile, male
30.35
%
Net attendance rate, lower secondary, middle quintile, both sexes
24.52
%
Net attendance rate, lower secondary, middle quintile, female
14.37
%
Net attendance rate, lower secondary, middle quintile, gender parity index
0.4158
GPI
Net attendance rate, lower secondary, middle quintile, male
34.56
%
Net attendance rate, lower secondary, fourth quintile, both sexes
34.13
%
Net attendance rate, lower secondary, fourth quintile, female
23.54
%
Net attendance rate, lower secondary, fourth quintile, gender parity index
0.5167
GPI
Net attendance rate, lower secondary, fourth quintile, male
45.56
%
Net attendance rate, lower secondary, richest quintile, both sexes
49.36
%
Net attendance rate, lower secondary, richest quintile, female
43.43
%
Net attendance rate, lower secondary, richest quintile, gender parity index
0.794
GPI
Net attendance rate, lower secondary, richest quintile, male
54.7
%
Net attendance rate, lower secondary, rural, both sexes
24.73
%
Net attendance rate, lower secondary, rural, female
14.47
%
Net attendance rate, lower secondary, rural, gender parity index
0.4239
GPI
Net attendance rate, lower secondary, rural, male
34.14
%
Net attendance rate, lower secondary, urban, both sexes
49.55
%
Net attendance rate, lower secondary, urban, female
46.03
%
Net attendance rate, lower secondary, urban, gender parity index
0.8686
GPI
Net attendance rate, lower secondary, urban, male
53
%
Adjusted net attendance rate, primary, both sexes
57.29
%
Adjusted net attendance rate, primary, female
48.12
%
Adjusted net attendance rate, primary, gender parity index
0.7359
GPI
Adjusted net attendance rate, primary, male
65.39
%
Adjusted net attendance rate, primary, poorest quintile, both sexes
41.83
%
Adjusted net attendance rate, primary, poorest quintile, female
31.27
%
Adjusted net attendance rate, primary, poorest quintile, gender parity index
0.6151
GPI
Adjusted net attendance rate, primary, poorest quintile, male
50.84
%
Adjusted net attendance rate, primary, second quintile, both sexes
48.61
%
Adjusted net attendance rate, primary, second quintile, female
38.62
%
Adjusted net attendance rate, primary, second quintile, gender parity index
0.6776
GPI
Adjusted net attendance rate, primary, second quintile, male
57
%
Adjusted net attendance rate, primary, middle quintile, both sexes
52.82
%
Adjusted net attendance rate, primary, middle quintile, female
41.4
%
Adjusted net attendance rate, primary, middle quintile, gender parity index
0.6622
GPI
Adjusted net attendance rate, primary, middle quintile, male
62.52
%
Adjusted net attendance rate, primary, fourth quintile, both sexes
63.66
%
Adjusted net attendance rate, primary, fourth quintile, female
54.41
%
Adjusted net attendance rate, primary, fourth quintile, gender parity index
0.7517
GPI
Adjusted net attendance rate, primary, fourth quintile, male
72.39
%
Adjusted net attendance rate, primary, richest quintile, both sexes
81.07
%
Adjusted net attendance rate, primary, richest quintile, female
74.77
%
Adjusted net attendance rate, primary, richest quintile, gender parity index
0.8594
GPI
Adjusted net attendance rate, primary, richest quintile, male
87
%
Adjusted net attendance rate, primary, rural, both sexes
52.53
%
Adjusted net attendance rate, primary, rural, female
42.22
%
Adjusted net attendance rate, primary, rural, gender parity index
0.6866
GPI
Adjusted net attendance rate, primary, rural, male
61.49
%
Adjusted net attendance rate, primary, urban, both sexes
79.43
%
Adjusted net attendance rate, primary, urban, female
74.35
%
Adjusted net attendance rate, primary, urban, gender parity index
0.8824
GPI
Adjusted net attendance rate, primary, urban, male
84.25
%
Total net attendance rate, lower secondary, both sexes
50.69
%
Total net attendance rate, lower secondary, female
36.57
%
Total net attendance rate, lower secondary, gender parity index
0.5733
GPI
Total net attendance rate, lower secondary, male
63.79
%
Total net attendance rate, lower secondary, poorest quintile, both sexes
31.19
%
Total net attendance rate, lower secondary, poorest quintile, female
15.81
%
Total net attendance rate, lower secondary, poorest quintile, gender parity index
0.3628
GPI
Total net attendance rate, lower secondary, poorest quintile, male
43.57
%
Total net attendance rate, lower secondary, second quintile, both sexes
37.68
%
Total net attendance rate, lower secondary, second quintile, female
22.65
%
Total net attendance rate, lower secondary, second quintile, gender parity index
0.4429
GPI
Total net attendance rate, lower secondary, second quintile, male
51.14
%
Total net attendance rate, lower secondary, middle quintile, both sexes
43.05
%
Total net attendance rate, lower secondary, middle quintile, female
26.77
%
Total net attendance rate, lower secondary, middle quintile, gender parity index
0.4526
GPI
Total net attendance rate, lower secondary, middle quintile, male
59.16
%
Total net attendance rate, lower secondary, fourth quintile, both sexes
58.61
%
Total net attendance rate, lower secondary, fourth quintile, female
42.73
%
Total net attendance rate, lower secondary, fourth quintile, gender parity index
0.5641
GPI
Total net attendance rate, lower secondary, fourth quintile, male
75.74
%
Total net attendance rate, lower secondary, richest quintile, both sexes
80.54
%
Total net attendance rate, lower secondary, richest quintile, female
70.82
%
Total net attendance rate, lower secondary, richest quintile, gender parity index
0.7933
GPI
Total net attendance rate, lower secondary, richest quintile, male
89.28
%
Total net attendance rate, lower secondary, rural, both sexes
44.52
%
Total net attendance rate, lower secondary, rural, female
28.94
%
Total net attendance rate, lower secondary, rural, gender parity index
0.4922
GPI
Total net attendance rate, lower secondary, rural, male
58.8
%
Total net attendance rate, lower secondary, urban, both sexes
79.09
%
Total net attendance rate, lower secondary, urban, female
70.47
%
Total net attendance rate, lower secondary, urban, gender parity index
0.805
GPI
Total net attendance rate, lower secondary, urban, male
87.55
%
New entrants to Grade 1 of primary education, both sexes
1159427
Persons
New entrants to Grade 1 of primary education, female
465590
Persons
Net enrolment rate, primary, gender parity index
0.3518
GPI
Net enrolment rate, lower secondary, both sexes
48.96
%
Net enrolment rate, lower secondary, female
36.49
%
Net enrolment rate, lower secondary, male
60.76
%
Net enrolment rate, secondary, gender parity index
0.5729
GPI
Net enrolment rate, upper secondary, both sexes
31.56
%
Net enrolment rate, upper secondary, female
21.98
%
Net enrolment rate, upper secondary, male
40.6
%
Adjusted net enrolment rate, primary, gender parity index
0.3518
GPI
Adjusted net enrolment rate, lower secondary, both sexes
50.63
%
Adjusted net enrolment rate, lower secondary, female
37.64
%
Adjusted net enrolment rate, lower secondary, gender parity index
0.5984
GPI
Adjusted net enrolment rate, lower secondary, male
62.91
%
Adjusted net enrolment rate, upper secondary, both sexes
32.42
%
Adjusted net enrolment rate, upper secondary, female
22.79
%
Adjusted net enrolment rate, upper secondary, gender parity index
0.5492
GPI
Adjusted net enrolment rate, upper secondary, male
41.49
%
Total net enrolment rate, primary, both sexes
85.69
%
Total net enrolment rate, primary, female
70.6
%
Total net enrolment rate, primary, gender parity index
0.706
GPI
Total net enrolment rate, primary, male
100
%
Total net enrolment rate, lower secondary, both sexes
65.5
%
Total net enrolment rate, lower secondary, female
49.09
%
Total net enrolment rate, lower secondary, gender parity index
0.606
GPI
Total net enrolment rate, lower secondary, male
81.01
%
Net intake rate to Grade 1 of primary education by under-age entrants (-1 year), both sexes
11.67
%
Net intake rate to Grade 1 of primary education by under-age entrants (-1 year), female
9.56
%
Net intake rate to Grade 1 of primary education by under-age entrants (-1 year), gender parity index
0.6992
GPI
Net intake rate to Grade 1 of primary education by under-age entrants (-1 year), male
13.67
%
Net intake rate to Grade 1 of primary education by over-age entrants (+1 year), both sexes
16.04
%
Net intake rate to Grade 1 of primary education by over-age entrants (+1 year), female
12.81
%
Net intake rate to Grade 1 of primary education by over-age entrants (+1 year), gender parity index
0.6708
GPI
Net intake rate to Grade 1 of primary education by over-age entrants (+1 year), male
19.1
%
Net intake rate to Grade 1 of primary education, gender parity index
0.7493
GPI
Adjusted net intake rate to Grade 1 of primary education, both sexes
19.85
%
Adjusted net intake rate to Grade 1 of primary education, female
10.12
%
Adjusted net intake rate to Grade 1 of primary education, gender parity index
0.3502
GPI
Adjusted net intake rate to Grade 1 of primary education, male
28.88
%
Percentage of students enrolled in primary education who are over-age, both sexes
5.71
%
Percentage of female students enrolled in primary education who are over-age, female
5.4
%
Percentage of male students enrolled in primary education who are over-age, male
5.91
%
Over-age enrolment ratio in primary education, both sexes
6.74
%
Over-age enrolment ratio in primary education, female
5.19
%
Over-age enrolment ratio in primary education, male
8.2
%
Total outbound internationally mobile tertiary students studying abroad, all countries, both sexes
12003
Persons
Out-of-school adolescents of lower secondary school age, both sexes
852184
Persons
Out-of-school adolescents of lower secondary school age, female
611119
Persons
Out-of-school adolescents of lower secondary school age, male
241065
Persons
Outbound mobility ratio, all regions, both sexes
9.67
%
Percentage of enrolment in lower secondary education in private institutions
2.19
%
Percentage of enrolment in upper secondary education in private institutions
1.62
%
Percentage of enrolment in post-secondary non-tertiary education in private institutions
5.41
%
Pupil-teacher ratio in lower secondary education (headcount basis)
43.9
Pupil-teacher ratio in upper secondary education (headcount basis)
30.28
Pupil-teacher ratio in tertiary education (headcount basis)
23.89
Repeaters in primary education, all grades, both sexes
70786
Persons
Repeaters in primary education, all grades, female
17696
Persons
Repeaters in Grade 1 of primary education, both sexes
12729
Persons
Repeaters in Grade 1 of primary education, female
3182
Persons
Repeaters in Grade 2 of primary education, both sexes
12098
Persons